Hans Journal of Civil Engineering 土木工程 , 2018, 7(2), 177-182
Published Online March 2018 in Hans. http://www.hanspub.org/journal/hjce
https://doi.org/10.12677/hjce.2018.72022
文章引用 : 徐艳群 , 刘传军 , 席翔 , 贺昌海 , 傅少君 . 文登抽水蓄能电站地下厂房施工仿真分析 [J]. 土木工程 , 2018,
7(2): 177-182. DOI: 10.12677/hjce.2018.72022
Simulation Analysis of Construction of
Underground Plant for Wendeng
Pumped Storage Project
Yanqun Xu 1