Project: IPS ⅡProject C435 MEI Owner: BYC
Contractor NCC REV. 0
09-YB-C435-SHF-
巴斯夫 -扬子一体化石化基地 II项目
BASF-YPC Integrated Petrochemical Site Project II
冬季施工方案
Cold Weather Construction Plan
(AREA1 )
合同号: A4DT-90-C435//IPSII-1000-20-C-435
Contract No: A4DT-90-C435//IPSII-1000-20-C-435
编制:
Prepared by:
审核:
Reviewed by:
批准:
Approved by:
Nanjing Chemical Construction Co., Ltd.
南京南化建设有限公司
14 .