南水北调渠道衬砌施工工艺和质量控制
: The Xinwei third section of South-to-North Water
Diversion is the third construction section in Xinxiang
Weihui section of the central line main part of
South-to-North Water Diversion Project, with total length
of 5.1km, and channel length 3.9km. Due to the long channels
distance, and wide cross section, it is difficult to
organize the construction and manage quality in t