无梁现浇混凝土 GBF管空心楼盖质量控制
: the cast-in-situ concrete hollow floor (GBF tube)
structure is a dark beam and not by the core pulling type
hollow floor structure composed of system, the application
of the ministry of construction as a new technology, in part
of the building has been very good use. According to the
hollow floor engineering work experience, talk about the
project cast-in-situ hollow f