目 录
一、编制依据 ························· 1
二、工程概况 ························· 2
三、施工方法和工作程序 ···················· 2
1.中央分隔带 ························ 2
2.横向排水管施工工艺流程 ·················· 3
3.纵向排水沟施工工艺流程 ·················· 7
4.纵向集水槽施工工艺流程 ·················· 9
四、资源配置计划 ······················· 10
1、人员安排 ························ 10
2、材料要求 ························ 11
3、施工机械 ························